The Energy Health Check by Solar Bangladesh by ACTS precisely evaluates your commercial electricity consumption, peak demand, grid dependency, diesel generator usage, solar generation, electricity tariffs, battery and UPS infrastructure, and major electrical loads. This professional assessment is designed to help industrial and commercial facilities identify actionable opportunities to improve energy efficiency, increase solar utilization, manage peak demand, heavily reduce diesel generator dependency, and optimize the overall cost of operations.

What the Factory Health Checkup Includes

  • Energy Consumption Analysis, Review historical electricity bills, consumption patterns, operational hours, and major electrical loads.
  • Load and Demand Assessment, Evaluate your sanctioned load and maximum demand to accurately map your current power requirements.
  • Grid Dependency Analysis, Assess your reliance on grid electricity and pinpoint strategic areas for energy optimization.
  • Diesel Generator Usage Assessment, Review current diesel generator utilization and identify opportunities to cut fuel consumption and lower operational costs.
  • Solar Performance Review, Evaluate any existing solar generation systems and identify pathways to maximize solar yield.
  • Battery and BESS Assessment, Review your existing battery, UPS, or Battery Energy Storage System (BESS) infrastructure and its critical role in meeting your energy needs.
  • Tariff Analysis, Evaluate electricity tariffs and temporal energy usage patterns to uncover hidden cost-saving opportunities.

Get Your ACTS Energy Score

As part of the technical assessment, you will receive an ACTS Energy Score ranging from 0 to 100. This metric helps benchmark your facility’s current energy performance and pinpoints specific infrastructure areas that require immediate attention.

How the Assessment Benefits Your Business

  • Understand exactly where and how your facility is consuming energy.
  • Identify concrete opportunities to reduce reliance on grid power.
  • Evaluate technical avenues for solar capacity optimization.
  • Assess strategies for significant diesel generator reduction.
  • Explore advanced Battery Energy Storage System (BESS) applications.
  • Manage peak electricity demand efficiently to avoid penalty rates.
  • Optimize your overall commercial electricity overhead.

Book a Factory Health Checkup Visit with Solar Bangladesh by ACTS today to gain a clear, data-driven understanding of your facility’s energy usage, electrical infrastructure, and long-term optimization potential.

 

This serivice is powered by our Concern Service Energy Audit Bangladesh